Day 913…


Nope, I didn't finish the bathroom this weekend like I'd thought! I'm tired of it! I never want to see tile again!! I might actually be afraid to enter the bathroom once it is complete… if ever!

Besides taking forever, it is actually coming along quite nicely and I have some pictures for you to view. I also installed a version of  Lightbox Lightbox instructions:

- You can navigate using your mouse, hover over the left or right side click close or grayed out area to close.

- You can use the arrow keys to navigate through pictures, Esc. to close.
to make the picture viewing more enjoyable.

Just to take you back, Jen and I got our inspiration for this project when we were in Italy. We stayed at a hotel that had a completely tiled bathroom, with a waterfall tub, rain shower and LED light design in the ceiling, so we decided to design a bathroom that would incorporate some (or all) of these into our own bathroom. We designed it to have the rain shower, regular shower, waterfall bath filler and a fiber optic star field ceiling.

Inspiration in Italy

Inspiration in Italy

Master Plans 1A

Master Plans 1A

Master Plans 1B

Master Plans 1B



We framed and waterproofed the floor, shower and tub area.

Schlutering

Schlutering

working hard

me working (or posing)

Shower waterproofed

Shower waterproofed



We picked some tile we liked and dry fitted it before sticking it down.

Tile that caught our eye

Tile that caught our eye

dry fitting shower

dry fitting shower

dry fitting the floor

dry fitting floor


removed the cabinets

Removed the cabinets

removed cabinets for tiling

Removed the cabinets

We decided to remove the Cabinet and tile under it incase we decide to change out the counter later down the road (which is part of the master plan).

Next we stuck the dry fitted tile down with mortar then cut some more and stuck them down as well. This is a long process when you only work at it evenings and weekends and have a cheap Princess Auto wet saw that only cost $50 and sprays water everywhere when you use it.

dirty

The floor dirty from mortar.

tub taped for protection

Shower and tub partially complete

tub

Dry fitting more tiles around the tub


Almost done

Shower and tub almost complete

 
shower with edging

Putting the tile edging up on the shower

 
tub with edging

Tile edging and more tile around the tub



And this is were I'm at today. The tub side is grouted and the fixers are on. this is what the waterfall tub filler looks like while filling the tub.
Where I'm at on May 4th

I didn't have the magnetic access hatch for the bottom of the tub on that is why the picture is cut off an on an angle.


Tags: , , , , ,